[ARCHIVED] Request for Proposals | Roundabout at Progress Parkway and Michigan Road

RFP (1)


RFP (1)

REQUEST FOR PROPOSALS

City of Shelbyville Roundabout at Progress Parkway and Michigan Road

Issued on October 11th, 2024

Proposals Due Date and Time: November 8, 2024 at 4:00 p.m.


Office of the City Engineer

44 W. Washington Street

Shelbyville, IN 46176

317-392-5102

WWWW.SHELBYVILLE.IN.GOV



ThisRequest for Proposals (RFP) is official notification of needed professional services.


As of October 28, 2024, you can find the SS4A Roundabout Addendum here.


This RFPis being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered.


Project Description: The City of Shelbyville is looking for qualified firms to design a roundabout at the intersection of Progress Parkway and Michigan Road. Work will include design, utility coordination, R/W purchasing, and bidding services.


Contact for Questions: 

John Kuntz, City Engineer

44 W. Washington St

Shelbyville, IN 46176

317-392-5102

john.kuntz@cityofshelbyvillein.com


Requirements for Letters of Interest (LOI)

  1. Provide the firm name, address of the responsible office from which the work will be performed, and the name and email address of the contact person authorized to negotiate for the associated work.

  2. List firm’s qualifications and experience that they have roundabouts design.

  3. List the Project Manager and other key staff members who will be working on this

project, if selected. Included staff qualification and key experience related to this

project and breakdown of estimated percentage of work each staff member will

perform.

  1. Provided unique ways your firm will approach this project and how they will approach the safety of both pedestrians and vehicles.

  2. Proposed schedule on when components of the roundabout will be completed. This shall be broken down by design, utility coordination, R/W purchasing, letting, and construction.

  3. LOI’s shall be limited to twelve (12) pages.


Submission: 

LOI’s shall be submitted electronically (pdf) to John Kuntz at email address

john.kuntz@cityofshelbyvillein.com.


LOI’s must be received no later than the “Proposals Due Date and Time” listed above. Responses received after this deadline will not be considered.


Project Fee: If selected, the firm will be paid through cost reimbursement with an agreed upon maximum cost. Proposed price shall be included in the proposal.


Project Schedule: If selected, the roundabout construction completion date will be December 31, 2028. The city will prefer construction to take place in 2027 and preference will be given to proposals with an earlier timeline.


Selection Procedures: Consultants will be selected for work based on the evaluation of the LOI. TheConsultant Selection Rating Form used to evaluate and score is included for your reference. Final selection ranking will be determined by the weighted score totals with the highest score being the top ranked firm.


Required INDOT Prequalification Categories:

5.2 Environmental Document Preparation – CE

6.1 Topographical Survey Data Collection

8.1 Non-Complex Rodway Design

11.1 Right of Way Plan Development

12.1 Project Management for Acquisition Services

12.2 Title Search

12.4 Appraisal

12.5 Appraisal Review


Additional Information:

Link to Shelbyville Safety Action Plan


Link to Consultant Selection Rating Form and preliminary draft of work